LOCAL BUSINESSES

Please get in touch early to register your interest in supplying to the project, should planning permission be approved

Have Your Say

You can voice your opinion by registering and leaving feedback.

Greystone Knowe Wind Farm

Site Location 

The site location is shown on the plan below:

Why Greystone Knowe?

Coriolis Energy have identified the proposed development site as having good potential for a wind farm for the following key reasons:

  • The area was considered likely to have a suitable wind speed
  • Absence of statutory nationally designated areas/sites of landscape, cultural or natural heritage importance on site
  • Easily accessible from the trunk road network
  • Significant potential for a positive contribution to the environment.

What is currently being proposed?

Number of turbines: up to 14

Maximum height of turbines: up to 180m to blade tip 

Capacity of each turbine: around 5MW

In addition to the turbines, important infrastructure such as an onsite substation, access tracks and underground cabling form key components of the proposed wind farm. The potential for energy storage is also being evaluated.

garvary wind farm